Permit Types

Event in Right-of-Way - Town of Perth ($50.0)

An Event in Right-of-Way Permit (Event ROW) is required when an event requires the occupation and disruption of traffic within a road authority’s right-of-way’s, including roads, sidewalks, trails and paths.

Permit applications may be made to one or more road authorities with this service (coming soon).

Preview

Municipal Consent - Town of Perth ($50)

Municipal Consent is the municipality’s authorization for a utility to occupy a specific location(s) within the municipalities right-of-way. Municipal Consent will only be issued to utility companies, commissions, agencies, other municipalities, or private applicants who have a municipal access agreement with the municipality applied to. The project of adding or modifying the plant is often subject to a Work in Right-of-Way permit.

Preview

OO Annual - Town - Perth ($50.0 /per hauling unit)

An Oversize/Overweight Annual Permit (O/O Annual) allows for the hauling of oversize/overweight loads during the period permitted, as defined by the Highway Traffic Act (HTA), that are within the specified maximum weights and dimensions permitted, and that are also subject to seasonal, fixed and temporary load restrictions.

Preview

OO Trip - Town - Perth ($25.0 /per load)

An Oversize/Overweight Load - Trip Permit (OO Trip) is required for the transportation of a load(s) that exceeds the limits prescribed in the Highway Traffic Act (HTA), on a specific day(s), on a specific route, that is not already allowed for by a current Oversize/Overweight Load - Annual Permit (OO Annual).

Application may be made to multiple road authorities on a route with this service, by selecting the Multi-Jurisdiction option (coming soon).

Preview

Road Entrance Permit - Town of Perth ($80.0)

A Road Entrance permit is required to add or reclassify a permanent or temporary road entrance at a specific location. The project of adding or modifying the road entrance may be subject to a Work in Right-of-Way permit that is associated with the Road Entrance permit.

Preview

Sign Adjacent to Right-of-Way Permit - Town of Perth ($50.0)

A Sign adjacent to Right-of-Way Permit (Sign a/ROW) is required for signs adjacent to right-of-way’s, in accordance with municipal bylaws.

Preview

Sign in Right-of-Way Permit - Town of Perth ($50.0)

A Sign in Right-of-Way Permit (Sign in ROW) is required for private signs to be located at a specific location within the road authority’s right-of-way.

Preview

Work in Right-of-Way Permit - Town of Perth ($50.0)

A Work in Right-of-Way Permit relates to any activity that results in traffic disruption, including bins, materials and equipment blocking lanes, or the cutting, excavation, boring, filling, additions, or altering in any way, roadways, curbs, sidewalks, boulevards, ditches, trails, and other areas within the right-of-way. A traffic plan in compliance with the Ontario Traffic Manual (OTM), Book 7, Temporary Conditions for traffic plan instructions, may be required.

Application may be made to multiple road authorities with this service (e.g., county road, town sidewalk), by selecting the Multi-Jurisdiction option (coming soon).

Preview OTM Book 7